Project Description

THE PROJECT

The project involves the construction of a cogeneration plant of electrical and thermal energy to supply the AGC glass manufacturing plant with the possibility of recovering and reusing heat for the district heating of the city of Cuneo.The approximately 45 km of excavations for pipe installation have been used for drawing up an optic fiber data network. The network allows the interconnection of all the distribution substation and the provision of other services.Project inauguration: 18 October 2018, Investment: approx. € 50 million in approx 3 years, District heating network length: 45 km, Users: about 400 users (public and private), Expected energy production: > 170 GWh/year

FINAL CLIENT:

Wedge Power Spa

THE CHALLENGE:

Monitor and control in an optimized way the 500 thermal substations; provide a real-time data analysis to detect any anomalies and failures.

OUR PRODUCTS: